Installation Instructions for FRP Tank(2)

Installation Instructions for FRP Tank(2)

6.3 After the container is filled with water, keep the horizontal tank for 24h and the vertical tank for 40h to check whether there is leakage.

6.4 The flat-bottom container is filled with water after the fine sand pad at the bottom. After the test is completed, the anchor bolt hole is poured, the fine sand filler sand retaining groove and the asphalt sealing groove are filled.

7. Installation precautions

7.1 Pad sand at the bottom of vertical flat bottom container

Full contact with sand at the bottom of vertical flat bottom container is the key factor to ensure safe use, otherwise, it is easy to cause damage at the bottom corner and leakage.

7.2 Process pipe connection

The process pipe connected with the container should be installed with a flange before the noose, to prevent the stress concentration on the container interface flange, causing damage.

(1) To avoid stress concentration after tightening bolts. The tightening force of bolts should be symmetrical and uniform.

(2) Connection with vibration equipment

When the container is connected with other vibrating equipment (such as between the inlet flange and the pump), the flexible connection should be used to avoid long-term vibration and damage to the FRP container.

(3) Connections to large equipment

When the container is connected with other large equipment or when the large container is connected with other equipment, flexible connection should be used to prevent the sinking of the equipment or the container foundation from causing the damage of the interface flange.

(4) Connection of heavy fittings

Valves and other heavy fittings installed on containers shall be supported separately.

8. Instructions and precautions for container use

8.1 Normal pressure capacity

No pressure or negative pressure should be pumped. Air holes should be opened in the process of adding liquid or draining liquid, and should not be added or drained in a closed state.

8.2 The conditions of use specified in the Contract shall not be exceeded

The container is specially designed according to the use conditions stipulated in the contract. Without the permission of the technical department of the supplier, the concentration and temperature of the storage medium should not be changed at will, let alone the type of the storage medium.

8.3 Special accessories should not be installed at will

Unless specifically required in the contract, large accessories, such as agitators, special valves or vibration equipment, should not be installed. If these accessories are actually needed, they should be indicated in the contract to make special design to ensure safety in use.

8.4 Should not be hit or scratched by hard objects

When entering the container for cleaning and maintenance, the operator should wear soft-soled shoes. When using a ladder, all the points in contact with the container should be covered with a quality pad to prevent scratching the surface. When working around the container, prevent the collision of the container with tools, scaffolding and other hard objects

8.5 Keep away from fire

Under normal circumstances, FRP products should not be near the source of fire.

8.6 Maintenance of containers

Fiberglass containers (especially the upper head) exposed to the sun for a number of years, the surface of the fiber exposed phenomenon (underground or indoor such problems do not exist), the application of resin or paint to maintain the method to extend the life of the.

8.7 The user shall be responsible for the quality problems arising from the installation and use of the products not in accordance with the requirements.

We are FRP Tank Manufacturers. If you are interested in our products, please feel free to contact us.

FRP On-Site Large Storage Tank

2023年2月9日星期四

Installation Instructions for FRP Tank(1)

Installation Instructions for FRP Tank(1)

FRP Tank Suppliers will share this article with you.

1.Sand mat

Spread a layer of building sand on the concrete foundation, (sand should be screened, rice sand should be used), sand should not contain more than 5mm of the gravel sand layer should be thick and thin in the center, about 15mm in the middle, about 5mm in the periphery, uniform transition. The maximum cushion is not more than 20mm, and all parts of the bottom of the container should be in contact with the sand layer. In order to ensure that the transition is uniform and flat, the side of the plate can be scraped, a 15mm nail is nailed at the end of the plate, and a 5mm nail is nailed at the other end, and then the center of the foundation is the center of the circle, and the radius of the tank is the radius of the circle.

2.Fall tank

According to the lifting requirements, the container should be carefully placed on the sand layer, and the hook should not be removed first after the tank is dropped, so that the container can be lifted repeatedly before the sand.

3.Processing

From the manhole into the container, by stepping and percussion method to check whether the various parts of the pad sign, remember the inconsistent parts, and predict the container bottom and sand layer gap size, the container will be lifted again, level off the sand layer, so repeatedly, until the requirements are met.

4.Pour anchor bolts

For containers with anchor bolts, install anchor bolts on empty containers, water fixed anchor bolts, and water slurry should be level with the foundation.

Nuts cannot be tightened to prevent anchor bolts from being stressed when full water test is done later

For the container with anchor bolts, if the anchor ring is detachable, a layer of 4mm ~6mm thick rubber plate should be padded between the container wall and the anchor. It should be ensured that the anchor ring is completely consistent with the rubber plate and the rubber plate and the container wall.

5.Make sand retaining groove

In order to prevent the fine sand around the bottom of the container from being washed away by rain or overflow, the sand retaining groove should be built or poured according to the requirements. After the groove solidifies, and the container is full of water and tested for leakage, the groove is filled with fine sand and rammed, and the upper mouth of the sand retaining groove is closed by pouring with asphalt or asphalt mortar to prevent the water and sand loss in the groove.

6.Water filling test

6.1 During the whole process of water filling and drainage, the vent hole above the container should be opened to prevent accidental pressure or negative pressure pumping of the container.

6.2 The drain valve, manhole and flange are installed on the blind plate, and the water pump is used to fill the container. In the process of filling the water, the noise of choking may be emitted, which is a normal phenomenon, as long as the FRP tank is not damaged in transportation and does not affect the safety of use.

Fiber Reinforced Plastic Waste Water Collection Tank

Do You Know The Differences Between GRP And FRP?

The term   FRP   is often used interchangeably when referring to   GRP , a broader generic term more commonly used for engineering materials...